solutions-for-15000-m/day-reclaimed-water-membrane-system-in-steel-plant, solutions-for-15000-m/day-reclaimed-water-membrane-system-in-steel-plant, /steel-industry
Inquiry
solutions-for-15000-m/day-reclaimed-water-membrane-system-in-steel-plant, solutions-for-15000-m/day-reclaimed-water-membrane-system-in-steel-plant, 
Inquiry

Solutions for 15,000 m³/day Reclaimed Water Membrane System in Steel Plant

Project challenges: The recovery rate of the first-stage RO system was only 60%. The membrane elements had short service life, and the desalination rate dropped sharply to 90% after around 2 years of operation.

Our technical team conducted on-site inspection and water analysis, and confirmed that excessive iron ions from pipeline rust caused rising differential pressure.

Solutions-for-Reclaimed-Water-Membrane-System-in-Steel-Plant.webp

We redesigned the cleaning procedure and chemical formula by increasing acid cleaning frequency and reducing alkaline cleaning frequency.

After optimization, the differential pressure returned to normal. The service life of membrane elements was extended from 2 years to 3 years, which greatly reduced equipment replacement and maintenance costs.

day reclaimed water membrane system in steel plant-1

Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Name
Company Name
Message
0/1000